2024 BMW M4 Competition at Weir Canyon Acura
https://research.weircanyonacura.com/cars/Used/2024/BMW/M4/Competition/175879392024 BMW M4 Competition
Selling Price : $68,995
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 28,212
- VIN : WBS33BA09RCP14311
- Stock # : 00113628
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : White
- Int. Color : Black
- Vehicle Type : Convertible
- Body Style : 2D Convertible
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
2024 BMW M4 Competition xDrive Convertible 3L I-6 direct injection, DOHC, Double VANOS variable valve control, TwinPower twin turbo, premium gasoline, engine with 503HP; 8-speed automatic. This open-top M4 marries BMWs xDrive all-wheel traction with a high-output inline-six and rapid-shifting eight-speed transmission to deliver explosive thrust and surefooted cornering, while still offering reasonable fuel economy for a high-performance convertible. Price has dropped by $1,000 recently, so act soon well-equipped, powerful convertibles move fast and locking in a test drive now helps secure this savings before someone else does. This vehicle was a prior lease.
Wireless Apple CarPlay and Android Auto let you mirror navigation, calls and music to the cars display without cords, keeping the cockpit tidy and your attention on the road.
Forward collision mitigation stays attentive to traffic ahead and can intervene when needed, giving you an extra layer of protection in stop-and-go conditions or sudden slowdowns.
Front pedestrian impact prevention continually scans the road for people and can take proactive steps to help avoid collisions in busy urban settings, adding confidence on crowded streets.
A built-in mobile hotspot keeps passengers online during long drives so everyone can stream, work or stay connected without draining phone data plans.
The rear camera provides a clear, enlarged view behind the car to simplify parking and tight maneuvers, reducing guesswork when reversing.
Rear collision mitigation watches for hazards closing from behind and prepares the vehicle and occupants if a rear impact appears likely, helping to reduce potential consequences.
Brake assist amplifies stopping power during emergency braking, helping you apply maximum brake force quickly when split-second reactions matter.
Cruise control with steering-wheel controls keeps highway speeds steady and lets you adjust settings without taking your hands off the wheel, reducing fatigue on long trips.
The voice-activated integrated navigation responds to spoken directions so you can find destinations and reroute without looking away from the road.
Heated driver and front passenger seats warm up quickly on cold mornings, helping you get comfortable faster and enjoy a cozier cabin from the first mile.
The 2024 BMW M4 Competition xDrive Convertible blends blistering performance, year-round traction and modern safety and connectivity in a refined roadster package. With the recent $1,000 price reduction, this example represents timely value for buyers who want a sharp-driving convertible with contemporary tech and active safety systems schedule a test drive soon to experience its pace and poise and to secure the current price before its gone.
Wireless Apple CarPlay and Android Auto let you mirror navigation, calls and music to the cars display without cords, keeping the cockpit tidy and your attention on the road.
Forward collision mitigation stays attentive to traffic ahead and can intervene when needed, giving you an extra layer of protection in stop-and-go conditions or sudden slowdowns.
Front pedestrian impact prevention continually scans the road for people and can take proactive steps to help avoid collisions in busy urban settings, adding confidence on crowded streets.
A built-in mobile hotspot keeps passengers online during long drives so everyone can stream, work or stay connected without draining phone data plans.
The rear camera provides a clear, enlarged view behind the car to simplify parking and tight maneuvers, reducing guesswork when reversing.
Rear collision mitigation watches for hazards closing from behind and prepares the vehicle and occupants if a rear impact appears likely, helping to reduce potential consequences.
Brake assist amplifies stopping power during emergency braking, helping you apply maximum brake force quickly when split-second reactions matter.
Cruise control with steering-wheel controls keeps highway speeds steady and lets you adjust settings without taking your hands off the wheel, reducing fatigue on long trips.
The voice-activated integrated navigation responds to spoken directions so you can find destinations and reroute without looking away from the road.
Heated driver and front passenger seats warm up quickly on cold mornings, helping you get comfortable faster and enjoy a cozier cabin from the first mile.
The 2024 BMW M4 Competition xDrive Convertible blends blistering performance, year-round traction and modern safety and connectivity in a refined roadster package. With the recent $1,000 price reduction, this example represents timely value for buyers who want a sharp-driving convertible with contemporary tech and active safety systems schedule a test drive soon to experience its pace and poise and to secure the current price before its gone.
Our dealership is your top choice for quality vehicles, serving Irvine, Riverside, San Bernardino, Yo
Vehicle Features
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
- M Sport Seats
- Extended Merino Leather Upholstery
- Radio: AM/FM Audio System
- M Compound Brakes w/Black Calipers
- Carbon Fiber Trim
- Neck Warmer
- Power Front Seats
- Lumbar Support
- Heated Front Seats
- SiriusXM w/360L
- harman/kardon Surround Sound System
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Connected Package Pro
- Personal eSIM 5G
- Navigation
- Widescreen Display
- 4-Wheel Disc Brakes
- Emergency communication system: BMW Assist eCall
- AM/FM radio: SiriusXM with 360L
- harman/kardon® Speakers
- Auto High-beam Headlights
- Exterior Parking Camera Rear
- Compass
- 16 Speakers
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Front beverage holders
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Speed-sensing steering
- Speed control
- Security system
- Remote keyless entry
- Rear window defroster
- Rear seat center armrest
- Rear reading lights
- Rear anti-roll bar
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Power convertible roof
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead console
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Leather steering wheel
- Knee airbag
- Integrated roll-over protection
- Illuminated entry
- Heated front seats
- Heated door mirrors
- Glass rear window
- Garage door transmitter
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- Convertible roof wind blocker
- Convertible roof lining
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Alloy wheels
- Adaptive suspension
- ABS brakes
- Tachometer
- Navigation System
- Leather Shift Knob
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.